Tuesday 15 March 2011

4th Episode : Marking Construction Site

continued from the previous post...... ^_^

After the construction site cleaned on Thursday (3/6/2010) .... on the next Saturday (5/6/2010) , we were taught how to mark the construction sites in the right way before starting the construction process by En. Hashim ( the construction adviser ) ....



Measure the site
make sure it's straight
determine the pad footing area
marking the pad footing area


sites were marked


On the same day....  we were divided into 3 groups and were asked by En. Hashim to discuss how to produce a scale drawing of the star base in true and accurate size.... the drawing will guide the formwork design process of  the star base ..... we were given a day to think and plan a simple way, fast and accurately to produce the drawing.... the drawing will be perform on the next Monday (7/6/2010) ...

En. Hashim
Short briefing from En. Hashim












will be continued.... :)

Tuesday 1 March 2011

3rd Episode : Site Cleaning

Assalamua'laikum and Salam 1 MALAYSIA to all readers  ^_^
 


After the fourth model was produced & completed, we have decided to begin our construction activities..... Our dream almost came true and we can't wait to see it standing proudly..

 * We start with cleaning up our construction sites..... and the first activities is, remove the trees =)

The site ( before cleaning )
pose before start cleaning work
remove tree

The site (after cleaning )



 Fuuuuh, it has been a long day for us but in the same time we feel so excited with this activities because sooner or later we can see our clock tower standing right there ^^ thats all for now hope you guys enjoy read it...